Welcome: Ningbo Haijiang Machinery Manufacturing Co.,Ltd.
Language: Chinese ∷  English

Industry new

Injection molding machine installation and testing

Injection molding machines are sophisticated equipment that require careful installation and precise debugging to ensure they operate efficiently and produce high-quality parts. Here is a general overview of the installation and debugging process:

**Installation:**

1. **Site Preparation:** The site where the injection molding machine will be installed should be level, clean, and have adequate space for the machine, operators, and material handling. It's also crucial to consider ventilation, power supply, and connectivity to other systems like cooling water supply or centralized material drying systems.

2. **Transport and Handling:** Injection molding machines can be quite heavy and delicate; therefore, they must be transported carefully to the installation site. Proper lifting equipment should be used to avoid damaging the machine or its components.

3. **Machine Placement:** The machine should be positioned on the prepared site according to the manufacturer's specifications. It needs to be leveled both horizontally and vertically using leveling pads or shims as necessary.

4. **Electrical Connection:** A qualified electrician should connect the injection molding machine to the power source, ensuring it meets all local electrical codes and standards. Additionally, grounding should be properly executed to prevent electrical faults.

5. **Hydraulic and Cooling System Hookup:** If the machine uses hydraulic systems, these need to be connected to the appropriate power units. Similarly, the cooling system, which is crucial for controlling the temperature of the mold and plastic, must be connected to a water supply or a dedicated chiller unit.

**Debugging:**

1. **Initial Startup:** Once all the installation procedures are complete, the machine can be powered on for initial testing. This includes checking for any leaks in the hydraulic system, ensuring all motors and movements are functioning, and monitoring for proper electrical connections.

2. **Parameter Setup:** The injection molding parameters such as injection pressure, holding pressure, back pressure, screw rotation speed, and mold temperature must be set based on the manufacturer's recommendations and adjusted according to the properties of the plastic material being used.

3. **Dry Run:** Before using actual plastic material, a dry run is performed to make sure all mechanical operations are coordinated and the machine is running smoothly. This includes opening and closing the mold, moving the injection unit, and running the ejector system.

4. **Material Testing:** With the machine running, test shots are made with the selected material to dial in viscous heating, injection speed, and holding times. The goal is to achieve the desired part quality without causing defects or excessive wear on the machine.

5. **Mold Adjustment:** After preliminary tests, the mold may require adjustments to resolve issues like flash, sink marks, or mismatched part dimensions. This step ensures that the final product meets the required specifications.

6. **Fine-Tuning:** Based on the results from material testing and mold adjustments, the machine settings are fine-tuned to reach optimal performance. This may involve adjusting timings, pressures, and temperatures microscopically until consistent high-quality parts are produced.

Proper installation and debugging are critical for the performance and longevity of injection molding machines. These processes require close collaboration between machinery specialists, technicians, and often the mold designer to ensure that everything is set up correctly for efficient production.

CONTACT US

Contact: Michael

Phone: 13429384988

Tel: 0574-88233242

Email: sales@china-haijiang.com

Add: Baozhan road, Yinzhou District, Ningbo (Tong Industrial Zone)

Scan the qr codeClose
the qr code